Tuesday, February 13, 2007
Eiffel Progress
I have finished the body up to the point of setting it aside to do the sleeves. I have started on sleeve number one. I am "loading up" on those heating pad type patches later this morning as I have to go run some errands, including a stop by the LYS. Anyway, I am seriously thinking of getting another set of size dbl pts and doing both sleeves at the same time. This pattern is going seriously fast, well being that I have had to sit on a heating pad on the sofa for my back and do little else beside knit and watch tv. Pics when I am done.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment